WhatsApp & Emails Valid for Arbitration | "No Signature Needed If Consent Is Clear": Delhi High Court

“WhatsApp and e mail exchanges can type a sound arbitration settlement even with out signatures,” guidelines Delhi HC, however denies interim aid citing lack of jurisdiction and no proof of intent to impede an arbitral award.

Thanks for studying this publish, do not forget to subscribe!

WhatsApp & Emails Valid for Arbitration | "No Signature Needed If Consent Is Clear": Delhi High Court

NEW DELHI: The Delhi Excessive Courtroom held {that a} legitimate arbitration settlement existed primarily based on e mail and WhatsApp exchanges, even and not using a signed contract, as permitted beneath Part 7(4)(b) of the Arbitration Act.

Nonetheless, the Courtroom discovered it lacked territorial jurisdiction and denied interim aid beneath Part 9, stating that unliquidated damages usually are not a debt except adjudicated, and no proof was offered to point out the respondent meant to impede a future arbitral award.

Background and Info of the Case

The petitioner, Belvedere Holdings Ltd., is a UAE-based firm engaged in buying and selling and supplying coal. The respondents embrace OCL Iron and Metal Ltd. (Respondent No. 1), a producer of direct lowered iron and metal, together with its wholly owned subsidiaries—Oriental Iron Casting Ltd. (Respondent No. 2) and Aron Auto Ltd. (Respondent No. 3).

On 30 September 2022, a consultant of S.M. Niryat Pvt. Ltd. (SMN) contacted Belvedere’s consultant through WhatsApp, requesting a coal provide proposal for November. Belvedere responded with worth and amount particulars. On 1 October 2022, a proper provide was shared to provide 75,000 to 150,000 MT of coal on CFR phrases to Indian ports, which SMN accepted through WhatsApp, thereby forming a preliminary settlement.

To formalize the transaction, Belvedere circulated the Commonplace Coal Buying and selling Settlement (ScoTA) on 13 October 2022, detailing key phrases equivalent to high quality, amount, pricing, supply ports, danger and title switch, and dispute decision through SIAC arbitration in Singapore.

SMN continued communications through WhatsApp and e mail, requested vessel nomination (as per ScoTA Clause 5), and proposed minor edits to the Transaction Abstract (TS). Belvedere nominated the vessel MV GLYFADA, and SMN confirmed the nomination on 27 October 2022.

By 31 October 2022, SMN accepted the amended TS and requested the ultimate contract, thereby affirming the settlement. Belvedere shared the ultimate signed model on 2 November 2022, additionally reminding SMN about overdue advance fee.

Regardless of a number of reminders between 3–14 November 2022, SMN neither signed the contract nor made the fee. On 15 November, SMN abruptly requested a change in supply schedule and later issued a cancellation discover. In the meantime, the vessel had already arrived inside the agreed laycan interval and tendered its Discover of Readiness on 10 November 2022.

Belvedere initiated arbitration proceedings with SIAC on 14 June 2024, claiming damages for wrongful termination and contractual breach. In response, OCL (respondent) submitted a letter to SIAC on 11 July 2024, stating that SMN had ceased to exist after being amalgamated with OCL, as per a 30 January 2024 NCLT order—a indisputable fact that Belvedere realized solely throughout arbitration.

Argument by the Events

Petitioner:

The petitioner argued {that a} binding contract (ScoTA) was concluded by way of negotiations and celebration conduct, even with out formal signatures, citing English legislation. SMN’s cancellation on 15 November 2022 amounted to wrongful repudiation after the petitioner had carried out its half. Losses have been actual and measurable on account of resale at a lower cost.

SMN hid its ongoing amalgamation with RI, which later denied legal responsibility. Nonetheless, beneath Part 232 of the Corporations Act, RI, because the transferee, is chargeable for SMN’s obligations. The petitioner additionally highlighted false statements by RI denying its Delhi workplace, regardless of opposite public information.

A Part 9 plea for interim aid was filed in November 2024, however RI delayed courtroom compliance and asset disclosure. The Excessive Courtroom initially disposed of the petition, however the Division Bench remitted it for contemporary consideration. Given RI’s monetary instability and danger of asset dissipation, the petitioner sought pressing safety of its declare.

Respondent:

The respondents, by way of Senior Advocate Mr. Krishnaraj Thaker, contended that no binding arbitration settlement existed because the ScoTA contract was by no means concluded.

They challenged the jurisdiction of the Delhi Excessive Courtroom, asserting that neither celebration at the moment maintains an workplace in Delhi, and mere historic references to a Delhi handle are irrelevant beneath Part 2(1)(e)(ii) of the Arbitration Act.

They additional argued that the petitioner’s December 2022 letter was merely a pre-arbitration discover, not a sound invocation of arbitration.

The respondents maintained that no a part of the reason for motion arose in Delhi, and the presence of property like shares within the metropolis doesn’t confer jurisdiction since these property are unrelated to the dispute. The damages claimed have been mentioned to be unliquidated and never a gift debt, making them ineligible for safety beneath Part 9.

They emphasised there was no proof of asset dissipation to justify interim safety, and the petitioner didn’t submit concrete proof of loss from the resale transaction.

Moreover, the petition was delayed, filed nicely after the November 2022 breach, and the petitioner had not availed the alternate treatment of interim aid obtainable beneath Rule 30 of the SIAC Guidelines. Consequently, the applying is barred beneath Part 9(3) of the Arbitration Act.

Discovering and Statement of the Courtroom

The Courtroom upheld the existence of a sound arbitration settlement between the events primarily based on e mail and WhatsApp exchanges, regardless of the absence of a signed contract. Citing Part 7(4)(b) of the Arbitration Act and Cox & Kings Ltd. v. SAP India Pvt. Ltd. (2024), the Courtroom dominated in favor of the petitioner on this level.

“Part 7(4)(b) permits an arbitration settlement to be legitimate even and not using a signed contract, so long as it’s mirrored in a documented alternate, like emails or messages, that exhibits mutual consent. Courts can infer settlement from such communications, as held in Shakti Bhog, Trimex, and Nice Offshore circumstances.”

Nonetheless, the Courtroom discovered that it lacked territorial jurisdiction since all materials elements of the transaction have been linked to RI’s Kolkata workplace. The mere presence of a department workplace in Delhi or RI’s shareholding in a Delhi-based firm didn’t set up jurisdiction. Therefore, this situation was determined in opposition to the petitioner.

On the declare of USD 2.77 million, the Courtroom dominated that

“Unliquidated damages don’t represent a debt till adjudicated.”

Counting on Union of India v. Raman Iron Foundry (1974), it emphasised that

“Breach of contract offers rise to a proper to sue, not an enforceable financial declare.”

Additional, interim aid beneath Part 9 of the Arbitration Act, akin to pre-trial asset attachment, was denied as a result of absence of proof that RI meant to impede any future award.

In conclusion, the petition was dismissed on grounds of lack of jurisdiction and failure to satisfy the authorized threshold for interim safety. The Courtroom clarified that its observations have been restricted to this interim software and wouldn’t have an effect on the arbitration proceedings.